Princeton University
Princeton, New Jersey

Princeton University has been a customer of Irwin & Leighton for 60 years. We are currently providing preconstruction services for several projects and have begun construction on the renovation of Dillon Gym as well as several summer renovation and system upgrade projects. Information and photographs of completed projects for which we have provided services for the University are highlighted below:

Holder, Hamilton and Madison Halls Renovation and Holder Tower Restoration

Located in the northwest corner of Princeton's campus, The Holder-Hamilton-Madison Halls complex was built between 1909 and 1917 and included two residence halls and dining facilities. Irwin & Leighton renovated all three buildings in overlapping phases over three years.

Architect:  Einhorn Yaffee Prescott
Holder Hall Renovation and Memorial Tower Restoration

Renovation of this historic residence hall involved ± 97,200 SF of interior renovations and included lowering the basement elevation to accommodate new common spaces and offices, all new windows and new mechanical, electrical and fire protection services as well as selective reroofing and exterior restoration.

The restoration of Holder Memorial Tower, performed to exacting historical standards, included cleaning, repointing, matching, and refurbishment of the 10-story masonry structure. Extensive logistical planning was required to develop an effective and safe scaffolding scheme as the tower reaches ± 200 feet above busy Nassau Street in downtown Princeton.

Princeton University, Madison Hall
Princeton University, Holder Hall Courtyard Princeton University, Holder Tower
Hamilton Hall

Renovation of this ± 17,000 SF historic residence hall required a high level of quality. The project included the Mathey Library, a theater, classroom, and computer laboratory as well as the creation of administrative and housing spaces. Irwin & Leighton’s work included complete interior demolition, structural work, replacement of leaded glass windows, an extensive amount of millwork, and new systems and finishes throughout.


Princeton University, Hamilton Hall Princeton University, Hamilton Hall Princeton University, Hamilton Hall Princeton University, Hamilton Hall
Madison Hall

The ± 68,000 SF renovation of historic Madison Hall involved the upgrade and restoration of two major dining halls and included extensive millwork and lighting. The bakery, kitchen, servery, and administrative areas were also completely renovated.


Princeton University, Mestres Dining Hall
Princeton University, Firestone Lounge Princeton University, Mathey Lounge Princeton University, Madison Hall Princeton University, Madison Hall

 

Jadwin Hall Renovation

Irwin & Leighton recently completed the final phase of a six-phased, multi-year renovation of Princeton University’s Physics building – Jadwin Hall. Irwin & Leighton was the original builder of Jadwin Hall in the early 1970s along with its neighbor building for Mathematics study – Fine Hall.

Begun in September 2009 and substantially completed in June 2013, the ± 240,000 SF renovation of the building (that remained occupied and operational throughout construction) encompassed office, classroom, laboratory, and mechanical spaces. The scope involved new interior finishes; an upgraded telecommunications infrastructure; a new fire protection system; replacement of the HVAC systems; installation of new energy efficient lighting; replacement of all perimeter windows; replacement of the existing electrical substation; and construction of a ± 8,000 SF penthouse to house the new mechanical equipment.

Architect:  MGA Partners and Payette (Phase 3)
Phase II – New Penthouse
Princeton University, Jadwin Hall
Phase III – Renovations
Princeton University, Jadwin Hall Princeton University, Jadwin Hall
Laser Laboratory
Princeton University, Jadwin Hall

 

Wu and Wilcox Halls Renovation

Renovation of dining halls and construction of a new kitchen and servery. The ± 26,000 SF project was substantially completed over a twelve-week summer period.

Architect:  Michael Graves & Associates
Princeton University, Wu/Wilcox Hall Princeton University, Wu/Wilcox Hall Princeton University, Wu/Wilcox Hall Princeton University, Wu/Wilcox Hall Princeton University, Wu/Wilcox Hall Princeton University, Wu/Wilcox Hall

 

Campus Club

Complete renovation and restoration of a 100-year-old eating club into a modern student activities facility. The project included new electrical, mechanical, and fire protection systems, a new open loop geothermal system, and a new elevator and other upgrades for ADA compliance while maintaining the architectural fabric of the building.

Architect:  Nalls Architecture
Princeton University, Campus Club Princeton University, Campus Club Princeton University, Campus Club

 

Witherspoon Hall

Witherspoon Hall, Princeton University's oldest residence hall, is listed on the National Register of Historic Places. Irwin & Leighton's complete renovation of this ± 45,000 SF building involved new mechanical and electrical systems, structural work including floor in-fills, new windows involving reuse of ±100 year-old chestnut frames, replacement of all stairs with new, extensive rebuilding and repair of the slate roof, and intricate millwork and trim throughout. Considerable sensitivity to design and finish details was required throughout the project.

Architect:  Goody, Clancy & Associates
Princeton University, Witherspoon Hall Princeton University, Witherspoon Hall Princeton University, Witherspoon Hall Princeton University, Witherspoon Hall

 

Little Hall

Renovation of a historic residence hall, ± 78,000 SF

Architect:  KieranTimberlake Associates
Princeton University, Little Hall
Princeton University, Little Hall Princeton University, Little Hall Princeton University, Little Hall Princeton University, Little Hall

 

Scully Hall

New residence hall, ± 90,000 SF

Architect:  Machado & Silvetti Associates
Princeton University, Scully Hall

 

Engineering Quadrangle New Parking Structure

Structural steel, poured-in-place concrete, ornamental screens and masonry, ± 140,000 SF

Architect:  Machado and Silvetti Associates, Inc.
Princeton University, Engineering Quad Parking Structure

 

Madison Hall Utility Vault

Construction of the new underground utility vault between two historic buildings required underpinning of the existing stone foundations.

Architect:  Einhorn Yaffee Prescott
Princeton University, Underground utility vault

Additional Projects for Princeton University

Fine Hall

Relocation of the Geographic Information Systems Center included custom fabricated work stations, map storage cases, and circulation desks.

Architect:  KSS Architects
Fine Hall

Renovation of Level B included interior fitout for new offices.

Architect:  KSS Architects
Firestone Library, Rare Books Collection Facility Renovation
Architect:  Kehrt Shatken Sharon: Architects
Eno Hall

Biology Department Renovations, ± 10,000 SF

Architect:  Kehrt Shatken Sharon
Summer Interior Renovation Projects and Multi-Phased Fire Code/Fire Alarm Upgrades

Since 1994, Irwin & Leighton has provided construction management services for numerous, complex, fast-tracked renovation projects including fire code/fire alarm upgrades for many of Princeton’s dormitories and educational facilities. Each required strong control of schedule as completion during the summer months was essential.

Year Description Architect/Engineer
2014 Fire alarm upgrades and miscellaneous interior renovations to Wyman House and 1915, 1937, 1938, 1939, Dodge-Osborn, Gauss, Corwin, Fisher, and Bendheim Halls.
Gittings & Associates
Seeler-Smith Associates
  Window Replacement for 1927-Clapp Hall. TBS Services, Inc.
2013 Fire alarm upgrades and miscellaneous interior renovations to 1927/Clapp, Dod, Scully, Walker, and Patton/Wright Halls Jeffrey Fleisher Architect
Zumpano Consulting Engineers
2011 2 Dickinson Street, 11 Dickinson Street, 35 University Place, Joline Hall, Campbell Hall, Witherspoon Hall, and Blair-Buyers Hall – Removal of existing fire alarm system and installation of a new low voltage addressable fire alarm system with voice annunciation.

Witherspoon and Joline Halls – Upgrades to laundry rooms

35 University Place – Fire code upgrades
Gittings & Associates
Seeler-Smith Associates
2010 1901-Laughlin and Pyne Halls – Removal of the existing fire alarm system and installation of a new low voltage addressable fire alarm system with voice annunciation. Gittings & Associates
Seeler-Smith Associates
2010 WU Hall – Replacement of two rooftop air handling units included structural work and re-roofing of the building as well as new ductwork and HVAC controls in second floor office space. Michael Graves & Associates
2004 1901-Laughlin, 1903, Henry, and Pyne Halls – Maintenance and upgrades of fire protection system, ± 211,000 SF Jeffrey Fleisher Architect
Seeler-Smith Associates
2003 New Graduate College (Phase V) and 1937, 1938, 1939, Dodge-Osborne, and Gauss Halls – Maintenance and upgrades of fire protection system, ± 102,000 SF Jeffrey Fleisher Architect
Seeler-Smith Associates
2003 New Graduate College – Kitchen Renovation Nalls Architecture
Seeler-Smith Associates
2002 New Graduate College (Phase IV) and Brown Hall – Maintenance and upgrades of fire protection system, ± 93,000 SF Jeffrey Fleisher Architect
Seeler-Smith Associates
2001 New Graduate College (Phase III) and Campbell, Clapp, Cuyler, Edwards, Feinberg and Joline Halls – Maintenance and upgrades of fire protection system, ± 190,000 SF Jeffrey Fleisher Architect
Thomas E. White, AIA
Seeler-Smith Associates
2000 1915, 1922, 1941, 1941, 1942, Lourie-Love and Walker Halls – Maintenance and upgrades of fire protection system, ± 89,000 SF George A. Fett, AIA
Seeler-Smith Associates
1999 New Graduate College (Phase II) and Campbell, Cuyler, Edwards, and Joline Halls – Maintenance and upgrades of fire protection system, ± 125,000 SF Robert D. Cerutti
George A. Fett, AIA
Thomas E. White, AIA
Hill & Bell Associates
Seeler-Smith Associates
1998 New Graduate College (Phase I) and 1915, Cuyler, Forbes, Foulke, Hamilton, Henry and Lockhart Halls – Maintenance and upgrades of fire protection system, ± 180,000 SF Same as 1999 above
1997 Pyne Hall – Renovation, ± 60,000 SF Seeler-Smith Associates
1997 1901-Laughlin, Dodge-Osborne and Wilco Halls – Maintenance and upgrades of fire protection system, ± 165,000 SF Hill & Bell Associates
1996 Holder Hall – Renovation, ± 60,000 SF Robert D. Cerutti
1996 1903 Hall – Maintenance and upgrades of fire protection system, ± 50,000 SF Hill & Bell Associates
1996 1937, 1938, and 1939 Halls – Maintenance and upgrades of fire protection system, ± 243,000 SF Seeler-Smith Associates
1995 McCosh Hall – Renovation, ± 3,000 SF Ford Farewell Mills and Gatsch
1995 1922, 1941, 1942, Gauss and Lourie-Love Halls – Maintenance and upgrades of fire protection system, ± 120,000 SF Hill & Bell Associates
Seeler-Smith Associates
1994 Card Access Control System – Phased Renovation VTS Engineering Design Group
1994 Green Hall – Maintenance and upgrades of fire protection system, ± 5,000 SF Dagit-Saylor Architects

 